It is the 12th of January and the team is working on the frame for their robot. The build team is constructing the metal frame and attaching the gear boxes. The wiring team attached a battery box the the wiring board and reattached the main power switch. Stan has stepped into Jame's shoes as safety manager and has already read most of the manual. The team was originally going to use mecanum wheels but they don't work in the frame so they are defaulting to standard wheels. Next meeting will be Wednesday.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
March 2015
Categories |